© 2024 – TEMA | Website Design by iSynergy Privacy Policy
Planning
Our planning included keeping the school operational while tearing off the existing roof and installing a new roof system.
Design
This project required a full roof tear off down to the metal deck. We designed a new roof system that tied into an existing roof system and would meet the requirement of a 20-year manufacturer warranty.
.060
Material – PVC 60 mil.
20 yr.
Warranty
17,127 sq.ft
Surface Area
32 Days
Duration
Results
Our extensive industry network, cutting-edge capabilities, and wealth of resources help us to remain one of the top roofing contractors in the country.