The challenge
Years of water infiltration through a BUR system past its life expectancy were causing physical plant problems inside the building.
The project had to be completed in the middle of winter, on a tall building in the heart of downtown, where job safety was the top priority.
The TEMA solution
After the City selected Strollo Architects to write specifications, TEMA was awarded the roofing bid. TEMA handled account management, site visits, material and equipment ordering, and detailed safety planning.
The crew completed a full tear-off and installed a 60 mil EPDM system, using crane lifts and high-safety procedures for the building height and location.
The result
The full re-roof was completed in about five weeks during winter, with no safety incidents.